The sample BOM used in this article
Every number below comes from one synthetic sample: the main board of an industrial IoT gateway, GW-200, with 59 lines, 225 parts and a cost of 89.11 USD per board at about 5,000 boards a year. Its prices are indicative and for demonstration only. The same BOM, with its approved vendor list, preferred parts list and supplier quotes, is free to download as the sample electronics BOM template.
1. Start with clean BOM data
A cost analysis is only as good as the BOM behind it. Check that every line has a manufacturer part number, a quantity and a unit cost, and that the extended cost equals quantity × unit cost. In the sample all 59 lines pass that check. Lines without a manufacturer part number, such as the M3 screws from a local hardware store, cannot be compared with distributor prices at all.
2. Find the few lines that carry most of the cost (Pareto / ABC)
Sort the lines by extended cost and add up their share of the total. In the sample, 14 of the 59 lines carry 81.4 % of the cost. Those A-class lines are where a cost-down review should spend its time.
| Part | Category | Extended cost (USD) | Share | Cumulative |
|---|---|---|---|---|
| STM32F429ZIT6 | Microcontroller | 18.50 | 20.8 % | 20.8 % |
| PCB-GW200-RC (6-layer) | PCB | 12.50 | 14.0 % | 34.8 % |
| MT41K256M16TW-107:P | Memory | 6.80 | 7.6 % | 42.4 % |
| 1984617 (×2) | Connector | 5.70 | 6.4 % | 48.8 % |
| DP83848CVV/NOPB | Interface | 4.90 | 5.5 % | 54.3 % |
The microcontroller and the bare board alone are more than a third of the cost. A saving of a few cents on a resistor matters far less than a decision about those two lines.
3. Align BOM prices with your quotes
BOM prices often lag behind what suppliers have actually quoted. The sample has quotes for 14 part numbers. Pricing each line at its quote instead of its BOM price lowers the board by 3.95 USD, which is 19,750 USD a year at 5,000 boards.
Saving per board = Σ (BOM unit cost − quoted unit cost) × quantity
summed over the lines with a quote; saving per year = saving per board × annual volume
Check the minimum order quantity of every quote. Two quotes in the sample ask for more than a year of volume: the SMA connector quote has an MOQ of 10,000 (two years of stock at one per board) and the secure element quote an MOQ of 8,000.
4. Consolidate duplicate lines
The same part sometimes appears on two lines at two prices. In the sample the LDO regulator LM1117MPX-3.3/NOPB is on line 8 at 0.95 USD and again on line 19 (the isolated RS-485 side) at 1.02 USD from another distributor. Buying both from one line and one source removes the price difference and doubles the quantity for the price break.
5. Standardize on preferred parts
A preferred parts list names the parts the company wants used again and again. Fewer distinct part numbers mean higher volumes per part, fewer reels on the pick-and-place machine and fewer parts to qualify. Compare each line of the BOM with the list and ask why it differs.
6. Right-size over-specified parts
A part chosen for an early prototype is often bigger than the product needs: more flash, more pins, a higher voltage rating. In the sample the preferred parts list offers a smaller variant of the same microcontroller family, STM32F427VGT6 (1 MB flash, LQFP-100, 14.20 USD), next to the STM32F429ZIT6 on the board (2 MB flash, LQFP-144, 18.50 USD). Whether it fits is an engineering decision: check the firmware size, the pins and the peripherals in use before you change it.
7. Replace parts before they become obsolete
Read the lifecycle status of every line. Three lines of the sample are not active: two are NRND (not recommended for new designs) and one is last time buy.
| Part | Function | Status | Candidate in the preferred parts list |
|---|---|---|---|
| MCP2551-I/SN | CAN transceiver | NRND | TJA1051T/3 (NXP) |
| ATECC608A-MAHDA-T | Secure element | NRND | ATECC608B-MAHDA-T (Microchip) |
| BS-6-1 | Coin cell holder | Last time buy | 1043 (Keystone Electronics) |
A candidate in a list is not yet a replacement: compare pinout, ratings and behaviour in the datasheets, and plan the requalification. Doing that before the last-time-buy date costs far less than a redesign under a shortage.
8. Consolidate suppliers and follow the approved vendor list
The sample buys from ten different sources, including a component broker and a local hardware store. Six lines are bought from a supplier that the approved vendor list does not name for that manufacturer, one manufacturer is only conditionally approved, and one manufacturer is not in the list at all. Moving those lines to approved franchised distributors lowers the counterfeit and quality risk and concentrates volume on fewer suppliers.
9. Use volume pricing deliberately
Price breaks reward volume, but only if the volume is real. Compare each price break with the annual quantity the product actually needs (quantity per board × boards per year) and with the shelf life and storage cost of the stock you would hold.
10. Look at design-level cost drivers
Some costs are fixed by the design, not by the purchasing. The sample board is a 6-layer PCB and carries eight through-hole parts (an RJ45 jack, two pluggable terminal blocks, two JST headers, two radial electrolytic capacitors and a TO-220 MOSFET), which add a separate soldering step. Layer count, board size and through-hole parts are worth questioning at the next layout revision, together with the engineers who own the signal integrity and the thermal design.
Count every saving once
Savings overlap: if a part is replaced, the quote-alignment saving on the old part disappears. Add savings up per line, keep the one that applies, and state the risk, the effort and the validation each change needs before it is approved.
Checklist
- Every line has a manufacturer part number, quantity, unit cost and a correct extended cost
- The A-class lines (about 80 % of the cost) are identified
- BOM prices are compared with current quotes, with their MOQs
- Duplicate part numbers are consolidated onto one line and one source
- Each line is compared with the preferred parts list
- NRND, last-time-buy, end-of-life and obsolete parts have a planned replacement
- Every line is bought from a supplier the approved vendor list allows
- Design-level drivers (layer count, board size, through-hole parts) are on the next review's agenda
- Every saving is counted once, with its risk and validation
Do it faster with MithraTiny BOM Cost Optimizer Agent
Find savings in an electronics bill of materials: duplicates, alternates, obsolete parts and supplier consolidation.
Related
By MithraTiny AI Labs · Published 2026-11-25